Fore
Landlord.
Looks very likely. 20 years brewing kits, and this Saturday might see AG#1.
I did receive my first piece of AG equipment in June 2014, so it's not like it's snuck up on me. More like.... FINALLY!
Mill, HLT, mash tun, boiler, cooler, ingredients, everything here, working & ready. I think I'm over engineering AG#1, which is sure to help in some ways, but I'm not expecting things to turn out perfect. Still, I'm about as ready to go as any AG#1er could ever be I think. Just the water which I'm still not really sure about.
Just recently bought a Lindr PYGMY 20 instant beer cooler, a bit like a maxi cooler but ready to go in 4 minutes. Took me 2 years after buying Cornies to get around to cooling. Still, I'm happy with my decision, even if it took 2 years to reach. Never really wanted a fridge.
So here goes. Worst that could happen is the boiler blowing out I think. Wish me well....
I did receive my first piece of AG equipment in June 2014, so it's not like it's snuck up on me. More like.... FINALLY!
Mill, HLT, mash tun, boiler, cooler, ingredients, everything here, working & ready. I think I'm over engineering AG#1, which is sure to help in some ways, but I'm not expecting things to turn out perfect. Still, I'm about as ready to go as any AG#1er could ever be I think. Just the water which I'm still not really sure about.
Just recently bought a Lindr PYGMY 20 instant beer cooler, a bit like a maxi cooler but ready to go in 4 minutes. Took me 2 years after buying Cornies to get around to cooling. Still, I'm happy with my decision, even if it took 2 years to reach. Never really wanted a fridge.
So here goes. Worst that could happen is the boiler blowing out I think. Wish me well....