This is one for the sparky's amongst us.
Just gathering my thoughts towards making a basic control panel to look after the elements in the HLT and Boiler, (PIDs, Probes, SSRs Switches pumps etc) and was wondering what criteria come into play when deciding to use double pole switches and switch...