C
cnelsonplumber
Guest
This is a learn as I go project so apologies if any of the questions that follow over the next few months seem daft.
I am starting with the boiler and have an immersion heater and the elusive 2 1/4" backnut complete with a selection of washers.
My first concern is getting a plastic boiler to drill through that will stand the temperature ie a thermoplastic vessel. This is mainly to keep the cost down and there seem to be many many suppliers of plastic fv's etc.
My starter kit came with 2 X 30 ltr FV's but I don't think they are up to the job.
Is anyone able to reccommend such an item?
Thanks
I am starting with the boiler and have an immersion heater and the elusive 2 1/4" backnut complete with a selection of washers.
My first concern is getting a plastic boiler to drill through that will stand the temperature ie a thermoplastic vessel. This is mainly to keep the cost down and there seem to be many many suppliers of plastic fv's etc.
My starter kit came with 2 X 30 ltr FV's but I don't think they are up to the job.
Is anyone able to reccommend such an item?
Thanks