user 18729
Flat out like a lizard drinking
- Joined
- May 19, 2017
- Messages
- 1,369
- Reaction score
- 1,266
Well, thought I’d make the most out of Lockdown and made a start on my control panel build. I was originally going to build a panel with two PIDs for use with my two vessel HERMS set up, but wanting to future proof it and hopefully have it wired up to a 2BBL brewery one day in the near future I’m going with a full panel build as per the electric brewery.
Finished cutting most of the holes this afternoon, next step is to attach the heat sinks, sand down and paint the enclosure.
I’ll update this thread with a few pictures and try to explain the hurdles along the way!
Finished cutting most of the holes this afternoon, next step is to attach the heat sinks, sand down and paint the enclosure.
I’ll update this thread with a few pictures and try to explain the hurdles along the way!
Last edited: